Dorfnest overpass

Photo: aerial view of a bridge construction site in autumn landscape
Facts and Figures
Company PORR SUISSE AG
PrincipalSchweizerische Bundesbahnen [Swiss Federal Railways]
LocationKloten - Switzerland
Type Bridge building
Runtime01.2016 - 07.2018

Bridge construction according to schedule.

The Dorfnest overpass project is a key project aimed at increasing the capacity of the suburban railway line between Zurich and Winterthur. The railway bridge is being constructed with the assistance of a rolled supporting structure integrated into a protective tunnel. The new line layout required an approximately 430m-long pile wall in a slope cutting, around 250m of earthen ramps and some 300m of road cutaway. 

With the new 200m-long bridge, trains will be able to cross the airport rail line without having to intersect with it. This avoids passenger and goods traffic having to wait. The bridge should be in use by December 2018, and from 2020 up to 670 trains per day will run along the stretch from Zurich to Winterthur—instead of the current total of “just” 550.

Find out interesting details about this project and other construction activities. To the online magazine