Projekt

151. Remisenstrasse overpass

- Remisenstrasse overpass The goal of this project was to demolish the existing railway bridge over the Remisenstrasse in Zurich, and to replace it with a new bridge and an auxiliary bridge. In order…
Projekt

152. Hergiswil N2 gantry roof

- Hergiswil N2 gantry roof In this project, PORR was contracted by the Nidwalden Canton Construction Office to create a 200m-long gallery to protect a section of the national route N2 and its central…
Projekt

153. Lenzburg workshop for the disabled

- Lenzburg workshop for the disabled With this prestigious building, PORR created forward-looking workspaces for people with particular care needs.  The more than 100m-long structure is located…
Projekt

154. Küssnacht SZ rail underpass

- Küssnacht SZ rail underpass In the course of this project under contract to SBB AG, PORR completed the spectacular replacement of a 100-year-old underpass with a new construction. All bridge elements…
Projekt

155. Gleistribüne Zürich

- Gleistribüne Zürich During this project, PORR constructed 139 rental apartments in three apartment buildings with five to seven floors. The ground floors contain retail spaces and commercial areas as…
Projekt

156. Zurich Gleisarena

- Zurich Gleisarena This office complex to the north of the platforms of Zurich's main railway station will consist of a seven-storey head building and a six-storey longitudinal building with a shared…
Projekt

157. Zurich airport - Echo North 1 Stands

- Zurich airport - Echo North 1 Stands As a result of their fleet expansion, Swiss increased the need for additional aircraft parking spaces at Zurich airport, and PORR was contracted to meet this…
Projekt

158. Feinspinnerei Windisch

- Feinspinnerei Windisch PORR completed this impressive residential construction on the banks of the Reuss River within 22 months.  The building contains 29 apartments aligned to the river and…
Projekt

159. Europaallee, Zurich - Site F

- Europaallee, Zurich - Site F Site F is the largest in Zurich's Europaallee, with a construction volume of around 180,000m³. PORR built three structures here: one free-standing, 16-storey residential…
Projekt

160. Europaallee Zurich – Bike park

- Europaallee Zurich – Bike park Since September 2017, it has become a lot easier to just hop off the train and straight onto your bike, thanks to the new bike park located right at Zurich Central…
Projekt

161. Europaallee, Zurich - Site D

- Europaallee, Zurich - Site D PORR built another spectacular building in the immediate vicinity of Zurich's main station: a four-storey base and two six-storey towers on top of it.  The new…
Projekt

162. Europaallee, Zurich - Site B

- Europaallee, Zurich - Site B Project with 12,300m² for service areas across nine floors, plus 2,450m² of restaurant and retail space on the ground and first floors. Both basement floors will be used…
Projekt

163. K27 Bristenstrasse

- K27 Bristenstrasse In March 2017, a landslide between the townships of Bristen and Amsteg buried a more than 10m stretch of the road connecting the two mountain villages, making it impassable. PORR…
Projekt

164. N02, EP Acheregg tunnel and Lopper viaduct

- N02, EP Acheregg tunnel and Lopper viaduct Before the PORR team was able to commence work on the safety measures required by this project, the rock face, which was heavily overgrown in places, first…
Projekt

165. Aabachtal viaduct

- Aabachtal viaduct During the period from 2010 to 2012, renovation works were carried out on the Aabachtal viaduct, which is one of the most heavily-used motorway bridges in Switzerland: around 80,000…
Projekt

166. Hard Turm Park

- Hard Turm Park PORR constructed a seven-storey high-rise for the Hard Turm Park project. From the ground to the fourth floor of this multi-purpose building, extending along the Pfingstweidstrasse,…
Projekt

167. Gurtnellen power station finishing works

- Gurtnellen power station finishing works Between October 2015 and October 2017, during the course of this infrastructure project, a pressure pipe from the 19th century was replaced. The pipeline…
Projekt

168. Seetalplatz flood control measures

- Seetalplatz flood control measures After the major flooding of 2005, a comprehensive flood control and land rehabilitation project for the Kleine Emme was launched. PORR was one of several companies…
Projekt

169. Village school building in Root

- Village school building in Root The “wood” project is an extension to a school building in the municipality of Root in Lucerne. The new construction, a composition of wood and concrete, is…
Projekt

170. Replacement of Blatten bridge

- Replacement of Blatten bridge The 64-year-old road bridge in Malters, much in need of renovation, was demolished under contract to the office of traffic and infrastructure construction, Lucerne…
Projekt

171. Oerlikon integration – Subsection 4.006

- Oerlikon integration – Subsection 4.006 The cross-city line from Altstetten through Zurich's central railway station to Oerlikon is a railway stretch of just 10km. This line passes beneath the…
Projekt

172. Dorfnest overpass

- Dorfnest overpass The Dorfnest overpass project is a key project aimed at increasing the capacity of the suburban railway line between Zurich and Winterthur. The railway bridge is being constructed…
Projekt

173. Cosmos Bern

- Cosmos Bern In the course of this project, PORR constructed two buildings with a total of 124 rental apartments, generous service spaces in the ground floor and underground parking in the basement.…
Projekt

174. Chrutacher bridge over the Waldemme, Flühli

- Chrutacher bridge over the Waldemme, Flühli Increased capacity and improved traffic safety were the main aims of this bridge renovation project, awarded by the Office of Traffic and Infrastructure…
Projekt

175. The Chedi Andermatt

- The Chedi Andermatt The Chedi Andermatt is Andermatt Swiss Alps AG’s premier hotel. In this project, the largest hotel scheme to be completed in Uri canton, the interplay between architecture and…
Projekt

176. Chärstelen bridge, Amsteg

- Chärstelen bridge, Amsteg The Chärstelen bridge was erected in 1880 as part of the course of construction works on the Gotthard railway. Even a bridge is not immune to the passing of time: in 2013,…
Projekt

177. Ausserfeld bridge, Stansstad

- Ausserfeld bridge, Stansstad The first stage of this project, under contract to the Nidwalden Canton office of civil engineering, was the demolition of the old road bridge. After that, PORR began…
Projekt

178. Europaallee stairway

- Europaallee stairway This project involved widening the Europaallee stairway at Zurich's central railway station from 10m to 34m. The stairway now leads travellers quickly and without obstruction…
Projekt

179. Alptransit Gotthard Nord – Rynächt trail Los 012

- Alptransit Gotthard Nord – Rynächt trail Los 012 The central element of the new trans-alpine railway project (NRLA) is the Gotthard base tunnel. PORR had already been heavily involved in the…
Presse

180. PORR takes over ALPINE Bau CZ a.s.

- Vienna, 29 August 2018 – The agreements for the transfer of all shares in ALPINE Bau CZ a.s. to PORR were signed today. The company will be completely integrated into the Group under the Czech…
Projekt

181. Biel Tunnel East Branch

- Biel Tunnel East Branch With the new link between Solothurn and Neuchâtel, the Biel motorway bypass closes one of the last gaps in the Swiss road system. The new section of tunnel around Biel…
Projekt

182. Muotathalerstrasse finishing works, Gibelhorn

- Muotathalerstrasse finishing works, Gibelhorn The renovation of the more than 1km long, very narrow access road in the Muotathal took place between 2013 and 2015. Initially, loose material had to be…