Skip to content

Rockfall protective netting with energy absorption - Gurtnellen Nord

Facts and Figures
Company PORR SUISSE AG
Principal SBB AG
Location Gurtnellen - Switzerland
Type Rock engineering
Runtime 07.2015 - 11.2015

Works on the SBB railway line.

In the course of this project, PORR cleaned and renovated the stonework along a 600m stretch of railway line. After cleaning, steel netting secured by tie anchors drilled into the rock was used to cover the whole face. Rail traffic remained unaffected throughout the works.