Chrutacher bridge over the Waldemme, Flühli
Company | PORR SUISSE AG |
Principal | Canton Lucerne, Traffic and Infrastructure Construction |
Location | Flühli - Switzerland |
Type | Bridge construction |
Runtime | 03.2017 - 03.2018 |
Replacement of an ageing bridge.
Increased capacity and improved traffic safety were the main aims of this bridge renovation project, awarded by the Office of Traffic and Infrastructure Construction, Lucerne Canton. The dilapidated round arch bridge, made from natural stone, no longer met current construction standards. Accordingly, it had to be demolished and replaced with a modern reinforced concrete bridge which would satisfy current requirements and standards.
The renewed section of the canton route K36, running Schüpfheim–Flühli–Sörenberg, measures around 250m. The more than 50m-long and 12m-wide concrete bridge had to be completely manufactured on site: abutments were constructed, the shoring erected and the bridge substructure formed. After reinforcement and tension cables had been laid, 560m3 of concrete was poured in a single cast.